Pump & effects · Coming soon
CyberPump
A sidechain pump that makes your effects pump along with it.
- 21 pump shapes
- Tempo, MIDI or sidechain
- 4 effect slots
- 22 effects
- Every setting can pump
- 74 factory presets
What it does
CyberPump starts where a sidechain compressor stops. The volume ducks in time with the song, and every setting of the four effects after it can duck along: a filter that closes on the kick, echoes that only ring in the gaps, a tape that brakes into every bar line. Each lane has its own depth, phase, shape and speed, and the display shows any of them, clicked straight from the knob.
The pump
Pick one of 21 shapes and a rate from 8 bars to 1/64, straight, dotted or triplet, and set how deep it ducks. Color decides what ducks, the whole sound or only the lows or the highs, a filter that closes with it, or the middle while the sides stay wide.
Driven by the song or a kick
Tempo follows the song's position. Trig and Trig Inv swell or duck while a MIDI note or the Trigger button is held. Sidechain plays one cycle per hit on a second input; Follow ducks by the kick's level.
Effects that pump along
Four slots after the pump, each any of twenty-two effects. Every continuous setting has a lane under its knob, so a filter can breathe, a delay's repeats can be cut on the beat and a reverb can bloom in the gaps.
Each lane its own
A lane has its own depth, either way, a phase against the pump, a shape (the pump's or another), and a speed from an eighth to eight times the pump's, so a filter can sweep once a bar while the volume pumps every beat.
Click a lane to see it
The big display shows the volume's gain curve or any lane on its setting's own scale, a cutoff in Hz from 20 Hz to 20 kHz. Drag it for the depth, Shift-drag for the phase, scroll for the shape; /2 and X2 halve or double the speed.
Twenty-two effects
Filter, Drive (four stacked stages, oversampled), Distortion, Crusher, Ring Mod, Freq Shift, Tape Stop, Pan, Delay, two reverbs, Chorus, Flanger, Phaser, Pitch, Width, EQ, Compressor, Overkill, OTT, Gate and the whole of Event Horizon, each with its own live display.
Drag to reorder
Drag a slot's tab onto another to change the order; its settings and lanes go with it.
Seventy-four presets
From Four On The Floor and Deep House Pump to Wub Machine, Vinyl Brake Beat, Laser Ping Pong and Breathing Cathedral, in groups for house, EDM, bass, techno, ambient, lo-fi, glitch, guitars and vocals.
Listen
Audio demos
Audio demos are on their way.
- Type
- Sidechain pump with effect slots (effect plugin, with a sidechain input)
- Formats
- AU, VST3 and Standalone
- macOS
- macOS 11 or later, Apple Silicon and Intel
- Windows and Linux
- VST3 and Standalone
- Sound design with Claude
- Optional, with your own Anthropic key: describe a sound and Claude sets CyberPump to make it (macOS and Windows)
- Status
- In development, version 0.2
- Price
- To be announced
CyberPump is coming soon
Leave your address and get a note the day it is released.